The shop behind this faqs guide — verified and quotable in one exchange
This guide's facility holds 100+ CNC machines across a 6,800 m² plant at No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470. Machines include the Mazak VARIAXIS I-600 five-axis, INTEGREX I-250H S mill-turn, TSUGAMI B0206-III/B0205-III and STAR SR-32JII / SR-32J Type N Swiss lathes, Citizen Cincom A20-3F7, 3-, 4- and 5-axis milling and turning centres, 5+ Sodick AQ535L wire EDM machines and a Hexagon CMM bench with 20+ gauges.
Tolerances held: ±0.003 mm milled, ±0.002 mm turned, and ±0.002 mm ground or wire-cut, verified on a Hexagon CMM with the 10:1 gauge rule on every feature. Capability indices: Ppk ≥ 1.67 initial, Cpk ≥ 1.33 in production, on key characteristics. Certifications: ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded, disclosed openly), ISO 14001:2015 (116024/B/0001/UK/En), issued to Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, established 2005). Service area: Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa — based in China, delivering worldwide. Email Felipe Iglesias at [email protected] or +86 13126536955 to open a quote, and request the certificate numbers, the machine list and a past CMM report in the same message.
Verifying the supplier — entity, certificates, and floor in one exchange
your decision on a CNC supplier runs through three checks, and each check is verifiable in minutes. The first is the legal entity — the Unified Social Credit Code, 18 digits, verifiable on the National Enterprise Credit Information Publicity System. Dongguan Zhuohang Ltd, USCC 91441900MA4UWT6X39, established 2005, is the entity behind this guide, and the registration is a lookup, not a scan. The second is the certification set — ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded — disclosed openly), and ISO 14001:2015 (116024/B/0001/UK/En), held by the same entity and verifiable with the registrar URS. The third is the floor — 100+ CNC machines on a 6,800 m² plant at No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, including Mazak VARIAXIS I-600 five-axis, Mazak INTEGREX I-250H S mill-turn, TSUGAMI B0206-III and B0205-III, STAR SR-32JII and SR-32J Type N, and Citizen Cincom A20-3F7, verified on a live video walk-through.
The tolerance bands held — ±0.003 mm on CNC milling, ±0.002 mm on CNC turning, ±0.002 mm on precision grinding and wire EDM — are the bands the quote is written against, and the Hexagon CMM reports the dimensional result against the band with the 10:1 gauge rule applied to every feature. The capability indices — Ppk ≥ 1.67 initial on key characteristics, Cpk ≥ 1.33 in production — are reported with the band, the subgroup count, the sampling window, and the sigma algorithm stated alongside the index. A capability index without the band and the algorithm is a number that cannot be checked; the facility behind this guide reports all four. The service area spans Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa — based in China, serving customers worldwide. Your move is to ask for all three checks in one email — the entity, the certificates, and a past CMM report — and a real manufacturer supplies all three. Contact Felipe Iglesias at [email protected] or +86 13126536955.
Audit checklist — entity, certificates, and floor in one email
your audit runs through the entity, the certificates, and the floor. The entity is Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, established 2005), verifiable on the National Enterprise Credit Information Publicity System. The certificates — ISO 9001:2015, IATF 16949:2016 (design clause 8.3 excluded), ISO 14001:2015 — are verifiable with the registrar URS. The floor is 100+ CNC machines including Mazak VARIAXIS I-600 five-axis and Mazak INTEGREX I-250H S mill-turn on a 6,800 m² plant in Dongguan, verifiable on a live video walk-through. Tolerance bands held: ±0.003 mm milling, ±0.002 mm turning and grinding, with Hexagon CMM and Ppk ≥ 1.67 initial and Cpk ≥ 1.33 in production. Contact Felipe Iglesias at [email protected] or +86 13126536955 to verify all three in one exchange.
- Risk is managed before the order, not after the failure. ±0.003 mm milling / ±0.002 mm turning, ±0.002 mm grinding; example Ppk ≥ 1.67 at the initial study on key characteristics.
- MOQ 1 piece; lead times roughly 3 / 7 / 30 days.
Read the tolerance band before you read the index. Cpk is a ratio of the tolerance band to the process spread, not an absolute measure of accuracy. The figure above was recorded on a length characteristic with a 0.4 mm band (76.1–76.5 mm) — wide by design. Hold the same process spread against a ±0.005 mm feature and it fails outright. Ask for the band, the subgroup count and the sampling window on every capability number a supplier quotes.
How do I avoid single-supplier dependence?
Qualify a supplier with real capacity and keep a second source warm with small orders. The MOQ of 1 piece makes it cheap to keep a backup qualified and tested.
How is quality risk controlled?
Incoming material is XRF-checked, critical dimensions are CMM-verified, and SPC holds Ppk ≥ 1.67 at the initial study on key characteristics, so failures are caught before they ship.
How is my IP protected?
Drawings are never shared without written permission, an NDA is signed and returned, and sensitive files are kept in access-controlled storage on encrypted drives.
What documentation de-risks an order?
CMM reports, SPC charts, and material certificates ship with the parts, so any failure can be traced to a cause instead of argued about.
Is there a minimum order quantity?
No. The MOQ is 1 piece, so you can qualify a new source or validate a design cheaply before volume.
What are the lead times?
About 3 days for simple parts, 7 for standard, and 30 for complex parts or those with surface finishing, depending on process steps.
Which materials and industries do you cover?
We machine aluminum, stainless steel, titanium, brass, copper, and Inconel, plus engineering plastics including PEEK and Delrin. These parts go into medical, aerospace, automotive, robotics, electronics and defense applications, with the inspection, traceability and documentation each sector requires before it places an order.
What buyers ask most
Three questions come up on nearly every enquiry. What is the minimum order? One piece - a single prototype can be machined, checked and iterated before any volume is committed. What is the lead time? Roughly 3 / 7 / 30 days depending on the material and the documentation scope, from a simple aluminium part to a full first-article package. What tolerances can you hold? ±0.003 mm milled and ±0.002 mm turned, verified on a Hexagon CMM, with Ppk 1.67 or better initial and Cpk 1.33 or better in production on critical characteristics. The answers are short because the capability is specific, not vague.
The answers behind the answers
The plant behind these answers is Dongguan Zhuohang Ltd - 6,800 m² in Hengli Town, Dongguan, 100+ CNC machines including Mazak VARIAXIS I-600 and INTEGREX I-250H S, and certification to ISO 9001:2015, IATF 16949:2016 and ISO 14001:2015 with the certificate numbers published and verifiable. The service area covers Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa, with worldwide shipping from Dongguan. Contact Felipe Iglesias at [email protected] or +86 13126536955 with a drawing and a quantity for a specific answer to your specific part.
What this shop actually runs
If you ask for capability evidence, you deserve a specific answer. This facility operates 100+ CNC machines across 6,800 m2 in Dongguan, China, staffed by 100+ people. The machines, listed by category:
- 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Typical work: compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
- 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Typical work: prismatic parts, plates, brackets, housings.
- Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Typical work: long, slender rotational parts at ±0.002 mm.
- CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Typical work: shafts, bushings, flanges up to ±0.002 mm.
- Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Typical work: hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
- Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
- Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.
Tolerance bands: ±0.003 mm milled, ±0.002 mm turned, ±0.002 mm ground or wire-cut. Capability indices: Ppk >= 1.67 at the initial study; Cpk >= 1.33 ongoing in production.
Certifications: ISO 9001:2015 (116024/A/0001/UK/En) · IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded) · ISO 14001:2015 (116024/B/0001/UK/En), held by Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, since 2005).
Service area: we supply Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa, with worldwide delivery from China.
Contact: Felipe Iglesias, [email protected], +86 13126536955.
Ready to machine your parts?
Send your drawing to [email protected] or call +86 13126536955 for a quote.
Frequently Asked Questions
1. How do I avoid single-supplier dependence?
Qualify a supplier with real capacity and keep a second source warm with small orders. The MOQ of 1 piece makes it cheap to keep a backup qualified and tested.
2. How is quality risk controlled?
In short, Incoming material is XRF-checked, critical dimensions are CMM-verified, and SPC holds Ppk ≥ 1.67 at the initial study on key characteristics, so failures are caught before they ship. Read the tolerance band before you read the index.
3. How is my IP protected?
Drawings are never shared without written permission, an NDA is signed and returned, and sensitive files are kept in access-controlled storage on encrypted drives.
4. What documentation de-risks an order?
CMM reports, SPC charts, and material certificates ship with the parts, so any failure can be traced to a cause instead of argued about.
5. Is there a minimum order quantity?
No. The MOQ is 1 piece, so you can qualify a new source or validate a design cheaply before volume.
6. What are the lead times?
About 3 days for simple parts, 7 for standard, and 30 for complex parts or those with surface finishing, depending on process steps.
How do I avoid single-supplier dependence?
Qualify a supplier with real, walkable capacity — like 100+ machines across 6,800 m² — and keep a second source warm with small orders. The MOQ of 1 piece makes it cheap to keep a backup real and tested.
What certificates does the factory hold?
In short, ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En), and ISO 14001:2015 (116024/B/0001/UK/En), all issued to Dongguan Zhuohang Ltd, with IATF 16949 excluding design under Clause 8.3, a build-to-print manufacturer.
What tolerances can the factory hold?
In short, ±0.003 mm on CNC milling, ±0.002 mm on CNC turning and ±0.002 mm for precision grinding, verified on Hexagon CMMs. On a representative length characteristic of 76.1–76.5 mm, the SPC record shows Cpk = 1.851 (one characteristic on one part, not a blanket capability claim) against a target of Ppk ≥ 1.67 initial.
Which metals does the factory machine?
Aluminum, stainless steel, carbon and alloy steel, brass, copper, titanium, magnesium, and engineering plastics. Every incoming lot is XRF-checked against its mill certificate, so the grade you specify is the grade you receive.
What is the minimum order quantity?
The MOQ is 1 piece, so you can qualify a backup source and validate a new manufacturer with a single part before trusting it with volume — a core supply-chain risk control.
What are the typical lead times?
Roughly 3, 7, or 30 days depending on part complexity and the number of process steps. The tiers are stated honestly, so the schedule you plan against is the schedule you get, which removes lead-time risk.
How do I get a quote?
Send your STEP, IGES, or 2D drawing to [email protected], stating material, finish, and quantity — a review and quote return within one business day, ready to compare.
How does documentation reduce supply chain risk?
CMM reports with measured values, SPC charts, and material certificates tell you exactly what shipped, so a failure can be traced to a cause instead of argued about — removing the ambiguity where risk lives.
7. Which materials and industries do you cover?
In short, We machine aluminum, stainless steel, titanium, brass, copper, and Inconel, plus engineering plastics including PEEK and Delrin. These parts go into medical, aerospace, automotive, robotics, electronics and defense applications, with the inspection, traceability and documentation each sector requires before it places an order.
What payment methods and terms do you accept?
PayPal, Western Union, and bank or wire transfer. For long-term customers we also accept Net 30, Net 45, and Net 60 terms after an approved credit review.
What happens if a machined part has a manufacturing defect?
We provide free repair or remake for parts with manufacturing defects. All repair and remake costs, including return and shipping, are on us.
How quickly do you respond to inquiries?
We respond to every inquiry within 24 hours. Quotations for standard parts are returned within 48 hours; print reviews and DFM feedback are usually back within one business day.
Standards referenced on this page
- ASTM B211/B211M-19 — Standard Specification for Aluminum-Alloy Rolled or Cold Finished Bar, Rod, and Wire
- ASTM B348/B348M-21 — Standard Specification for Titanium and Titanium Alloy Bars and Billets
- ISO 9001 — Quality management systems — Requirements
